Oasis / Qatar (Q) / 2018
For the Downtown Doha District, realization of 2285 wardrobes.
Frameworks in laminated walnut wood, comprehensive of drawer units with different measures.
Elaboration of the executive drawings, including the schemes of cut of the panels and the schemes of drilling.
Ironware supply: not included.
Installation: not included
Quantity: 2285 wardrobes
Production and supply timing: 3 months