Miami / Florida (USA) / 2019

Realization of 500 kitchens and 600 Vanity bathrooms.
Kitchen: Frameworks in laminated carb2 grey.
Bathrooms: frameworks in laminated carb2 grey.
Elaboration of the executive drawings, including the schemes of cut of the panels and the schemes of drilling.
Ironware supply: included
Installation: not included.
Material supply: on pallets different lots pre-assembled on pallet.

Quantity: 1100 modules
Production and supply timing:  2 months

Back