Al Fardan Tower / Arabia Saudita (Ksa) / 2015

For an apartment complex, realization of 77 + 604 kitchen.
Frameworks in laminated waterproof coloured in white.
Elaboration and submission to the producer of the executive drawings of all the components, including the schemes of cut of the panels and the schemes of drilling. Ironware and doors supply: not included.
Semi-finished material supplied on pallets.
Kitchen installation: not included.

Quantity: 77 + 604 Kitchens
Production and supply timing: 30 days (first slot) – 60 days (second slot)